247A

122

Works

APPENDIX VI (A).

PUBLIC WORKS LOAN (1927) ACCOUNT,

Head 1-Waterworks Development.

Sub-head 1-Shing Mun Valley Scheme.

Revised Estimated Cost

Expenditure to 31.12.20

Revised Estimated Expenditure 1930

Estimated Expenditure

1931

$

$

$

$

Item (a) Preliminary Works

(b) Reception Reservoirs, Shek Lai Pui Raw Water...

(c) Access Road: Tsun Wan Pineapple Pass

11,216.34

11,216.84

164.273.88

164,273.88

122,345.79

122,345.79

(d) Resumptions

(e) Filtering Plant and erection

520,937.48

182,132.39

211,000.00

200,048.14

290,000,00 10,000.00

(1) Tunnels and South Conduit

(f) Pipe Line

(g) Pipers Hill Reservoir

(h) Temporary Intake and Conduit

(j) North Conduit

(k) Harbour Pipes

(m) Miscellaneous

441,035.35

410,122.80

10,000.00

20,000.00

186,699.97

126,699.97

78.269.68

73,269.63

72.028.07 815.244.41 1,073.644.13

72.028.07

(n) Service Reservoir (Shek Lai Pui)

(o) 2nd Section Preliminary Works

(p) Byewash Reservoir

100.00 400,000.00 30,000.00 600,000.00

177,082.20 1,078,644.13 100.00 127,155.27 9,118.68 80,829.09

50,000.00

200,000.00 5,000.00 400,000,00

30,000.00

5,000.00

100,000.00

(4) Hong Kong Garden Service Reservoir

400,000.00

211.50

50,000.00

(r) Pipe Line (for Item (0))...

60,000.00

Total

$4,631.815.05

$2,790.227.88

80,000.00

$995,000.00

30,000.00

$235,000.00

Head 2.-Aerodrome and Harbour Development. Sub-Head 1-Harbour Development.

Works

Total Cost

Expenditure

to 31.12.29

Revised Estimated Estimated Expenditure Expenditure

$

$

1930

$

1931

$

Item (a) Dredging

450,896.21

(b) Harbour Cable

23.958.42

450,896.21 23,958.42

Total

474,854.63

474,854.63

Less Contribution from Hong Kong & Kowloon

Wharf & Godown Co., Ltd.

Total

58.124.95

$416.729.68

58,124.95

$416,729.68

Sub-Head 2.-Aerodrome,

Works

Revised Estimated Cost

Expenditure

to 31.12.20

Revised Estimated Expenditure

1980

Estimated Expenditure 1931

$

$

$

$

Item (a) Resumptions

1.186,250.00

1,158,698.62

27.500.00

(b) Formation of reclamation including completion

of sea walls, nullahs, surfacing and drainage... (c) Covering of Nullahs

788.000.00 275,000.00

635,381.63 168,901.48

102,000.00

50,000.00

50,000.00

(d) Slipways

275,000.00

141.688.11

50,000.00

84,000.00

(e) Roads

55.000.00

4,542.15

20,000.00

80,000.00

(f) Sheds

150,000.00

30,000.00

Total

2,679,250.00 2.109,161.99

249.500.00

200,000.00

Less Contribution from Imperial Government

(£100,000)

Total

1,052,783.50

$1.626.466.50

692.783.50

$1,416,378.49

$249,500.00

200,000.00